How to Price an Embroidery Job
Guide · Embroidery
Embroidery pricing goes wrong most often because sellers price by "gut feel" per item rather than accounting for what actually drives cost — stitch count is the single biggest lever, since it directly determines machine run time, and machine time is what limits how many jobs you can complete in a day.
What actually drives embroidery cost
- Stitch count — more stitches means more machine time and more thread consumed. A small 5,000-stitch logo and a dense 15,000-stitch design cost meaningfully different amounts to produce, even on the same blank.
- Thread — more colors mean more thread changes, which adds machine time even without changing total stitch count.
- Backing and stabilizer — cost varies by fabric type and design density; heavier fabrics or dense designs often need pricier stabilizer.
- Machine time — this is where stitch count converts into an actual dollar cost, since your machine (and your time overseeing it) has a real hourly value whether you're billing for it explicitly or not.
- The blank item itself — the shirt, hat, or bag you're stitching onto.
A simple pricing framework
- Add up your hard costs: blank item + thread + backing/stabilizer.
- Estimate machine run time from the stitch count, and assign it a per-minute cost based on your machine and labor overhead.
- Add your desired profit margin on top of the total.
- Sanity-check the result against what similar work sells for in your market — a mathematically correct price that's wildly out of line with the market usually means a cost assumption is off somewhere, not that the market is wrong.
Running the numbers
Doing this math by hand for every quote is slow and error-prone. The Embroidery Job Cost Calculator takes your stitch count, materials, and machine time rate, and returns a price with your margin already built in — so quoting a new job takes seconds instead of a spreadsheet each time.
Don't forget rush and setup fees
A same-day rush job or a brand-new digitized design (one that needs to be converted into a stitch file before it can even run) both add real cost beyond the per-item calculation above. Pricing those the same as a repeat order with an existing design file under-charges for the actual extra work involved.